It’s a mobile, pre-assembled and pre-wired system, designed to satisfy the growing need to reduce the installation time and space for installation on the construction site.
Its compact structure comprises all elements, so that it can be quickly changed from the transport configuration to the operational one.
It is equipped with a control cab that is incorporated in the structure even during the transport phase.
WINTER PACKAGE
The system is pre-configured for the installation of the technical devices and insulation needed in order to operate under extreme climatic conditions.
MIXING UNIT WITH INTEGRATED SKIP
The mixing unit is the heart of the system; this configuration it is equipped with the ORUMD 5000/3350 twin shaft mixer, which allows different types of concrete to be mixed while always guaranteeing the utmost quality. The mixing unit is also equipped with an expansion chamber (Airbag) that collects dust-filled air, generated by the aggregates and cement after entering the mixer. The skip, which comes complete with a gravity unloading hatch, slides inside a rail that is integral part of the structure. Its operation is extremely safe thanks to the presence of a set of limit switches and shut-off systems.
STORAGE UNIT FOR AGGREGATES WITH BELTUP
(ORU LOGIK WB4/102)
The aggregate storage and batching unit is modular, sturdy and completely hot-dip galvanized in order to guarantee maximum resistance and a long service life.
Thanks to the BELTUP weighing belt (patented), no costly concrete works are necessary (pillars and pits), and the loading point of the storage tanks stays extremely low.